ENGINEERING
for the future of your community

Projects Bidding

SECTION 00020 REQUEST FOR BIDS

TOWN OF LYNCHBURG
81 MAGNOLIA STREET
POST OFFICE BOX 147
LYNCHBURG, SOUTH CAROLINA 29080-0147
RIA NO.: R-18-1174
HPG PROJECT NO. 16064

Separate sealed Bids, for furnishing all materials, labor, tools, equipment and appurtenances necessary for the construction of New 8-Inch Water Line Replacement along US 76 will be received by the Owner at the Lynchburg Town Hall located at 81 Magnolia Street, Lynchburg, South Carolina until 2:00 p.m. on April 2, 2019 and then at said place be publicly opened and read aloud.

The Project consists of the following major elements:

Installation of approximately 7,400 LF 8-inch replacement water main, valves, hydrants, fittings, interconnections and relocation of taps.

The Instructions to Bidders, Bid Form, Contract Agreement, Plans, Specifications, and forms of Bid Bond, Performance Bond, Payment Bond and other Contract Documents may be examined at the following locations:

Lynchburg Town Hall: Lynchburg, SC
HPG and Company, Consulting Engineers, Inc.: West Columbia SC

Copies of Contract Documents and plans may be obtained from the office of HPG and Company, Consulting Engineers, Inc., 1432 Sunset Boulevard, West Columbia, SC 29169 upon a non-refundable payment of $60.00 for each set. Mailing address must be provided to ensure prompt delivery.

Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of South Carolina. The Bid Bond shall be in the amount of 5 percent of the Bid.

No Bid will be considered unless the Bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law.

The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid.

No Bidder may withdraw his Bid within 60 days after the date of the Bid opening.

The Owner reserves the right to reject any or all Bids and to waive any informalities.

TOWN OF LYNCHBURG




PLAN HOLDERS LIST
TOWN OF LYNCHBURG
NEW 8-INCH WATER LINE REPLACEMENT
ALONG US 76
BID DATE: APRIL 2, 2019 @ 2:00 PM
HPG FILE NO. 16064

Holzheimer Construction, Inc.
PO Box 571
Lexington, SC 29071
(P): (803) 892-6846
(F): (803) 892-6847

Palmetto Utility Group
PO Box 7
Branchville, SC 29432
(P): (843) 860-3068

Complete Utilities, LLC
PO Box 660
Scranton, SC 29591
(P): (843) 210-7473
(F): (843) 210-7473

NWF Industries, LLC
323 McCartha Road
Lexington, SC 29073
(P): (803) 223-9404

Stutts & Williams, LLC
Post Office Box 2046
Lexington, SC 29071
(P): (803) 319-6756

Evans Pavement Services
PO Box 3990
Florence, SC 29502
(P): (843) 617-6690

Watts & Associates Construction, LLC
PO Box 1363
Sumter, SC 29151
(P): (803) 495-4200
(F): (803) 495-4202

B&B Construction Company, Inc.
PO Box 1563
Sumter, SC 29151-1563
(P): (803) 775-6408
(F): (803) 934-8918

AAA Utility and Construction, LLC
PO Box 9404
Columbia, SC 29290
(P): (803) 238-2711
(F): (803) 753-9202




Bid Tabulation


TOWN OF LYNCHBURG
8-INCH WATER LINE REPLACEMENT ALONG US 76
RIA NO. R-18-1174
HPG FILE NO. 16064
BID DATE – APRIL 2, 2019 @ 2:00 PM

Contractor Bid Amount Order of Bid
B&B Construction Co., Inc. $362,880.00 1
Evans Pavement Services, Inc. $367,224.78 2
Lake Murray Utility Company, Inc. $386,820,00 3
Shady Grove Construction, LLC $390,933.10 4
Barwick Plumbing Co., LLC $395,045.00 5
Complete Utilities, LLC $417,538.00 6
Holzheimer Construction, Inc. $490,535.00 7
Stutts & Williams, LLC $515,733.00 8
AAA Utility and Construction LLC $589,337.69 9
NWF Industries, LLC No Bid -
Palmetto Utility Group No Bid -
Watts & Associates Construction, LLC No Bid -

CERTIFIED AS A TRUE AND CORRECT TABULATION OF BIDS RECEIVED